stand cover

GEINSA

Stand: 2B07(Floor plan)
Surface and heat engineering

Liquid penetrant installations

We design liquid penetrant lines for automated operation. The visual check is carried out in an opaque black room with the incorporation of ultraviolet lights, which show the faulty areas where, by capillarity, the developer liquid adheres.

product-image